Author: Franco Mangiarotti (CERN)
-
Status of SM18 test benches for SC magnets and SC-link, and test plan for 2024
Test bench requirements for the HL-LHC In the last years, the horizontal test benches have been modified to accommodate the HL-LHC magnet and SC-link test program. The number of HL-LHC magnet cryoassemblies to be validated (24 magnets + 8 SC-links + spares) is much lower than for the LHC, but there are more variations in…
