Author: Estrella Vergara Fernandez (CERN)
-
Long Shutdown 3 incoming: installations already heating up in the HiLumi LHC galleries
Since the summer of 2025 installations in the new High-Luminosity (HiLumi) LHC surface buildings and underground galleries at Points 1 and 5, and preparations for de-installation and installation works in Long Shutdown 3 (LS3), have been progressing at a high pace. On the surface, the installation of the cooling and ventilation systems in the SU…
